hey guys,
Did my first test fire in the 7400E this weekend just heating DHW in home and business. Unit tested well. Took 1 hr and 29min to get from 57 to 180 set point. After is shutdown it shot over to 194 degrees. Unit started gasifying after about 2 min from a cold start. the reaction chamber door is cool enough to hold your hand on while in full gasification.
The back pump area was very tight trying to fit 3 line sets and 3 pumps. I made it all work with still making enough to room to be able to open the back cleanout when necessary. I am going to use some foiled faced insulation board int eh back compartment to keep the fiberglass batts from being exposed (when that stuff gets wet, its ruined). one small leak and spraying water could ruin it.
The electrical hook up was pretty straight forward. The large industrial fan motor is very powerful yet surprisingly quiet.
I believe in the 7400E there is over 1,000lbs of cast refractory, the heat sink on the unit seems to be very nice. the bricks definitely hold a lot of heat. Obviously there isn't much a draw at the moment with only heating DHW.
So far I am pleased with the unit. It has been idling for 2 days and hardly fired, there is little to no creosote around the door frame and I haven't had a single drip come out of either door.
I will post pictures soon after my boiler room install is done and I will give everyone another update after we have some more time in with the unit.
Thanks!