Seriously gonna give this stuff a try. Dropped a stove off Friday afternoon and got it set, went back today to finish the job. Had my rolls of pex in the warm cab of the truck Friday, gave it to the guy to put in the house, sat in the house for 48 hours and was still stiff, didn’t have my rubber plugs to do the bathtub trick, had my heat gun though, heated the stuff up, wrastled it nice and straight, made my connections, went on down the line doing other stuff, come back 20 minutes later to see what was straight is now curved again, sh*t!!! Heated it up again and used some more supports to hopefully hold it in place. You’d think 48 hours in a warm house would help a little at least, stuff was like I just brought it in from outside.
It’s either figure out a way to spread the added cost of hy-PE-Rtube out else where or just start buying 20 foot straight sticks and build a rack on the trailer. Although straight sticks woulda kinda sucked as well, a little planning and some of the curve actually helped, like where I ran it thru the floor joists where they plan on actually finishing the basement.