All of my outside install is completed.
Concrete pad poured with pex running through it
Boiler sitting pretty on pad
175' logstor run from primary side of boiler to home 4' down
20' logstor run from secondary side of boiler to shop 3'down
both pumps installed and wired up
Manifold for water distribution made
manifold for floor distribution made
Wood Situation:
I have just shy of 20 cords of various wood cut. Quite a bit of ash and some elm, maple and oak. Some willow, spruce and pine in a separate pile split as much as possible to dry it out. I have to keep my wood dry so its all covered in black plastic right now. I am not happy with the arrangement but I was pretty busy at work and with the install this summer to build a wood enclosure to boot. I still have not decided which way to go with wood storage so I think I will just feel it out this season. I have quite a bit of ash that is 10-12 percent moisture and it is piled closest to the boiler. Probably 10 cords of it.
I am running my floor loops, installing my coil and mounting my manifolds tomorrow. I should be wrapped up in the next week or so.