When I get a big enough building built I am giving up on stacking my wood so I don't care what the length is as long as it fits in the boiler. I plan to have a lean to on the back of the barn I want to build with the nose of the boiler inside. Planning for a concrete knee wall between the barn and lean so I don't have to worry about bending up the siding shoving wood around with the bobcat. I know it will take longer to dry but with the surplus I have now I should stay two years ahead and give it enough time even under less than ideal conditions.