Well we had a good night tonight.Temps were back up in the 70's
I managed to fill the boiler full of water to double check for any leaks.I found one spot that was just barely sweating a little moisture.So I am pretty happy about that.
I then drained all the water back out.Made some brackets that the control panel mounts ,and then decided on a position and welded them to the tank.
I then decided on a position for the thermocouple tube to go into the water tank.Fired up the plasma cutter and made an oval hole in the top.Cool thing was that when i finnished the cut the air blowing into the tank made the cut out piece blow out onto the top of the tank and not fall inside.
I welded the tube in just were i wanted it.I have it angled as my thermocouple is about 20" long.I wanted to be able to easily pull it out if I need to replace it after the outer enclosure is built.
I then welded up the corners on the load door.I need to get the doors built and mounted.