Ok so here I am again but much closer to having a new heated home by an OWB boiler was dropped of last week a CB 5036, This is what I have so far, a basement w/o a floor hoping this week to be poured I do though have my vapor barrier, insulation and pex run as this is the same for the garage. Here is my queston (S)
I have 5 loops in the basement that run up the wall in the mechanical room, then I have 4 loops in the garage that run down the wall through a stub from the garage that comes directly over r the top of the basemet loops, this is the way the plumber said I should run it, now I was going to use Watts manifolds with the gauges and what you have in the but they only have manifolds that enter from the bottom, so I would assume I would have to build my own. Not a big deal I just am not 100% sure of what all needs to be into it I was hoping someone could draw me a picture of what this manifold should consist of.
And since were on this topic I was hoping someone could also draw me a picture of how my system should get tied all together, I have most the componets but again not sure what order they should go. It is a prssureized system that is headed with a plate exchanger. I would like to have the garage and the basement on separate zones obviously. Thanks to any help I can get I seem to work well with pictures because this is till very new to me.. Jared