24 x 46 first floor, three runs of .75 Onix in each bay under subfloor and wood flooring. Joist are logs so have to go around with the onix. Joist width vary from 18" to 23". Insulation for radiant is 2" r14 foil faced foam board, edges from foam board to joist is sprayed with closed cell foam to seal up.
Now I have to run 160 degree water through the radiant to maintain 68 degrees overnight on the colder night.
There are no transfer plates, but am planning on stopping by a metal fab shop in the morning to see what it would cost to make some.$$$$$$$$
ANY ideas.
Forgot to add, runs are 200 ft or less